Everything about The Sydney Harbour Tunnel totally explained
The
Sydney Harbour Tunnel is a twin tube road tunnel in
Sydney,
Australia. The tunnel was completed and opened to traffic in August 1992 to provide a second vehicular crossing of
Sydney Harbour to alleviate congestion on the
Sydney Harbour Bridge.
The tunnel joins the
Warringah Freeway at
North Sydney, and the
Cahill Expressway at the entrance to the Domain Tunnel. It has two lanes in each direction, and runs at an angle of approximately thirty degrees (North to South) to the Sydney Harbour Bridge, which has eight lanes, with a tidal flow operation. In 2005, the tunnel was carrying around 86,800 vehicles per day.
Construction
The tunnel is made up of three sections: twin 900-metre land tunnels on the north shore, twin 400-metre land tunnels on the south shore and a 960-metre
immersed tube (IMT) structure. The tunnel falls about 55 metres from the northern entrance and about 35 metres from the southern entrance to its deepest point, 20 metres below sea-level.
The IMT structure consists of eight
precast concrete units. The units were constructed over 100 kilometres away in a
dry dock at
Port Kembla and then towed to Sydney Harbour. A trench was dredged prior to the arrival of the IMTs and then the IMTs were lowered into the trench by a system of pontoons and control towers. After the IMTs were in place the trenches were backfilled and then a rock armour was placed over the top to protect the units against marine hazards, such as anchors or sinking vessels.
The land tunnels were constructed by a combination of driving and cut-and-cover techniques. The total construction cost of the project was
A$554 million, and was designed to be strong enough to withstand the impact of earthquakes and sinking ships.
One of the northern end pylons of the
Sydney Harbour Bridge was altered to allow for air exhaust from the tunnel to rise over the harbour. Bradfield Park on the northern side of the bridge also has hidden air intakes behind some conspicuously placed
bushes.
The tunnel was opened to the public to walk through from North Sydney (Falcon Street) to South Sydney (The Domain), on
27 August 1992. The proceeds of the tickets sold for this event were donated to the
Royal Institute for Deaf and Blind Children. The tunnel opened to traffic on
31 August,
1992.
Operator
The Harbour Tunnel was a partnership between the
NSW State Government and private investors via tender.
Transfield Pty Limited and
Kumagai Gumi formed a joint venture company which constructed the tunnel under contract. The tunnel is currently on a thirty-year lease, and will be handed back to the NSW State Government in August 2022.
There was a lot of scepticism surrounding the appointment of Transfield International to build the tunnel, after other projects including IMT tunnels, carried out by the group, developed structural problems resulting in leaks.
Tolling
Only southbound traffic (both for the Sydney Harbour Tunnel and Bridge) attracts a toll of
A$3.00 (currently). The NSW Government announced in 2006 that the
Sydney Orbital Network will phase out cash tolls by 2010.
The Sydney Harbour Tunnel went fully electronic from July 2007 with both
e-TAG and e-pass video tolling arrangements in use, similar to technologies used the
Westlink M7,
Cross City Tunnel and the
Lane Cove Tunnel. This measure has substantially eased the traffic jams heading towards the electronic gantries, and providing increased convenience and time savings.
Freeway connections
Further Information
Get more info on 'Sydney Harbour Tunnel'.
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://sydney_harbour_tunnel.totallyexplained.com">Sydney Harbour Tunnel Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |